# yedir-ai Dependency Risk Register Last local audit snapshot: 2026-05-27. This register tracks dependency security debt that cannot safely be fixed as an incidental change. It exists so commercial delivery and open-source review do not rely on hidden tribal knowledge. ## Audit Command Use the official npm registry for audit checks: ```bash pnpm audit:security pnpm audit:security:json pnpm --silent audit:security:json > audit-security.json ``` The explicit registry is intentional. Some mirrors do not implement the npm audit endpoint, which makes audit fail for infrastructure reasons rather than project reasons. Use `pnpm --silent audit:security:json` when another script needs machine-readable JSON without pnpm's script header. GitHub Actions also runs `.github/workflows/dependency-audit.yml` on push, pull request, weekly schedule and manual dispatch. Keep that workflow independent from the fast quality gate so registry or network issues do not hide lint/typecheck feedback. ## Current Snapshot `pnpm --silent audit:security:json` currently reports: - Critical: 0 advisories. - High: 0 advisories. - Moderate: 44 advisories. - Low: 1 advisory. The previous local baseline was Critical: 2 / High: 31. The remediation batches upgraded direct dependencies, patched transitive packages via `pnpm.overrides`, and removed the vulnerable `xlsx` parser dependency. ## Remaining Moderate / Low Buckets The current non-blocking advisories are still tracked because they may matter for specific feature surfaces: - `dompurify`: moderate XSS / sanitization bypass advisories from transitive rich-rendering dependencies. Treat any user-authored HTML rendering path as sensitive and prefer explicit server-side sanitization plus output escaping. - `mermaid`: moderate XSS / CSS injection / DoS advisories from diagram rendering dependencies. Avoid enabling untrusted Mermaid diagram rendering without sandboxing and version review. - `postcss`, `esbuild`, `brace-expansion`, `yaml`: moderate parser/dev-tooling advisories. These are primarily build-time or tooling-chain risks; keep production build and dependency audit workflows active. - `markdown-it`, `mdast-util-to-hast`, `prismjs`: moderate Markdown/syntax-rendering advisories. Treat user-provided Markdown as untrusted and keep renderer usage behind existing sanitization boundaries. - `uuid`, `ws`: moderate runtime/transitive advisories. Prefer patched transitive versions when upstream packages allow it; do not introduce new direct dependency pins that downgrade these packages. - `ai`: low filetype whitelist bypass advisory currently appears in audit output even though the direct dependency is on a patched line. Keep `pnpm audit:security` as the blocking high/critical gate and revisit if severity changes. These buckets do not currently block release because the enforced gate is high/critical zero. They should be revisited during dependency maintenance, public Markdown/diagram feature changes, or before changing the project to a fully public repository. ## Priority Remediation Buckets - `xlsx`: remediated by replacing spreadsheet import parsing with the existing `exceljs` dependency and dropping legacy `.xls` upload support from affected import paths. - `next`: remediated by resolving Next.js to `16.2.6`; keep route smoke tests in the verification path. - `fast-xml-parser`: remediated through a transitive override resolving to `5.8.0`. - `protobufjs`: remediated through a transitive override resolving to `7.5.6`. - `drizzle-orm`: remediated by upgrading to `0.45.2`; keep migration and route checks in future data-access changes. - `@vercel/blob` / `undici`: remediated through a transitive override resolving `undici` to a patched 6.x line. - `ultracite` transitive dev tooling chain: remediated through targeted transitive overrides for Vite/Rollup/Picomatch/tRPC/Lodash. ## Release Policy - Keep `pnpm audit:security` in the independent Dependency Audit workflow and as a pre-release review command rather than embedding it in `pnpm check:quality`; the registry-backed audit endpoint can fail for network or mirror reasons. - New direct dependencies should be checked with `pnpm audit:security` before merging. - Critical advisories in runtime dependencies should block production release unless they are proven unreachable and documented here. - High advisories should have either a remediation PR or an explicit risk acceptance note before commercial deployment. ## Verification After Remediation After each dependency remediation batch: ```bash pnpm install --frozen-lockfile pnpm check:quality pnpm audit:security AUTH_TRUST_HOST=true PORT=3001 pnpm dev SMOKE_BASE_URL=http://127.0.0.1:3001 pnpm smoke:routes ``` Record the remaining critical/high count in this file until the audit baseline reaches zero or only accepted exceptions remain.