4.8 KiB
yedir-ai Dependency Risk Register
Last local audit snapshot: 2026-05-27.
This register tracks dependency security debt that cannot safely be fixed as an incidental change. It exists so commercial delivery and open-source review do not rely on hidden tribal knowledge.
Audit Command
Use the official npm registry for audit checks:
pnpm audit:security
pnpm audit:security:json
pnpm --silent audit:security:json > audit-security.json
The explicit registry is intentional. Some mirrors do not implement the npm audit endpoint, which makes audit fail for infrastructure reasons rather than project reasons.
Use pnpm --silent audit:security:json when another script needs machine-readable JSON without pnpm's script header.
GitHub Actions can run .github/workflows/dependency-audit.yml through manual dispatch. Keep that workflow independent from the fast quality gate so registry or network issues do not hide lint/typecheck feedback. The private repository currently avoids automatic Actions triggers to preserve the free quota.
Current Snapshot
pnpm --silent audit:security:json currently reports:
- Critical: 0 advisories.
- High: 0 advisories.
- Moderate: 44 advisories.
- Low: 1 advisory.
The previous local baseline was Critical: 2 / High: 31. The remediation batches upgraded direct dependencies, patched transitive packages via pnpm.overrides, and removed the vulnerable xlsx parser dependency.
Remaining Moderate / Low Buckets
The current non-blocking advisories are still tracked because they may matter for specific feature surfaces:
dompurify: moderate XSS / sanitization bypass advisories from transitive rich-rendering dependencies. Treat any user-authored HTML rendering path as sensitive and prefer explicit server-side sanitization plus output escaping.mermaid: moderate XSS / CSS injection / DoS advisories from diagram rendering dependencies. Avoid enabling untrusted Mermaid diagram rendering without sandboxing and version review.postcss,esbuild,brace-expansion,yaml: moderate parser/dev-tooling advisories. These are primarily build-time or tooling-chain risks; keep production build and dependency audit workflows active.markdown-it,mdast-util-to-hast,prismjs: moderate Markdown/syntax-rendering advisories. Treat user-provided Markdown as untrusted and keep renderer usage behind existing sanitization boundaries.uuid,ws: moderate runtime/transitive advisories. Prefer patched transitive versions when upstream packages allow it; do not introduce new direct dependency pins that downgrade these packages.ai: low filetype whitelist bypass advisory currently appears in audit output even though the direct dependency is on a patched line. Keeppnpm audit:securityas the blocking high/critical gate and revisit if severity changes.
These buckets do not currently block release because the enforced gate is high/critical zero. They should be revisited during dependency maintenance, public Markdown/diagram feature changes, or before changing the project to a fully public repository.
Priority Remediation Buckets
xlsx: remediated by replacing spreadsheet import parsing with the existingexceljsdependency and dropping legacy.xlsupload support from affected import paths.next: remediated by resolving Next.js to16.2.6; keep route smoke tests in the verification path.fast-xml-parser: remediated through a transitive override resolving to5.8.0.protobufjs: remediated through a transitive override resolving to7.5.6.drizzle-orm: remediated by upgrading to0.45.2; keep migration and route checks in future data-access changes.@vercel/blob/undici: remediated through a transitive override resolvingundicito a patched 6.x line.ultracitetransitive dev tooling chain: remediated through targeted transitive overrides for Vite/Rollup/Picomatch/tRPC/Lodash.
Release Policy
- Keep
pnpm audit:securityin the independent Dependency Audit workflow and as a pre-release review command rather than embedding it inpnpm check:quality; the registry-backed audit endpoint can fail for network or mirror reasons. - New direct dependencies should be checked with
pnpm audit:securitybefore merging. - Critical advisories in runtime dependencies should block production release unless they are proven unreachable and documented here.
- High advisories should have either a remediation PR or an explicit risk acceptance note before commercial deployment.
Verification After Remediation
After each dependency remediation batch:
pnpm install --frozen-lockfile
pnpm check:quality
pnpm audit:security
AUTH_TRUST_HOST=true PORT=3001 pnpm dev
SMOKE_BASE_URL=http://127.0.0.1:3001 pnpm smoke:routes
Record the remaining critical/high count in this file until the audit baseline reaches zero or only accepted exceptions remain.