ai-chatbot/docs/dependency-risk-register.md

2.7 KiB

yedir-ai Dependency Risk Register

Last local audit snapshot: 2026-05-27.

This register tracks dependency security debt that cannot safely be fixed as an incidental change. It exists so commercial delivery and open-source review do not rely on hidden tribal knowledge.

Audit Command

Use the official npm registry for audit checks:

pnpm audit:security
pnpm audit:security:json
pnpm --silent audit:security:json > audit-security.json

The explicit registry is intentional. Some mirrors do not implement the npm audit endpoint, which makes audit fail for infrastructure reasons rather than project reasons. Use pnpm --silent audit:security:json when another script needs machine-readable JSON without pnpm's script header.

Current Snapshot

pnpm --silent audit:security:json currently reports:

  • Critical: 0 advisories.
  • High: 2 advisories.
  • Moderate: 44 advisories.
  • Low: 1 advisory.

The previous local baseline was Critical: 2 / High: 31. The first remediation batch upgraded direct dependencies and patched transitive packages via pnpm.overrides.

Priority Remediation Buckets

  • xlsx: two high advisories remain, and npm audit reports no patched version. Plan a replacement or isolation strategy rather than pretending a patch exists.
  • next: remediated by resolving Next.js to 16.2.6; keep route smoke tests in the verification path.
  • fast-xml-parser: remediated through a transitive override resolving to 5.8.0.
  • protobufjs: remediated through a transitive override resolving to 7.5.6.
  • drizzle-orm: remediated by upgrading to 0.45.2; keep migration and route checks in future data-access changes.
  • @vercel/blob / undici: remediated through a transitive override resolving undici to a patched 6.x line.
  • ultracite transitive dev tooling chain: remediated through targeted transitive overrides for Vite/Rollup/Picomatch/tRPC/Lodash.

Release Policy

  • Do not add pnpm audit:security to pnpm check:quality until the remaining xlsx advisories are removed or explicitly accepted with compensating controls.
  • New direct dependencies should be checked with pnpm audit:security before merging.
  • Critical advisories in runtime dependencies should block production release unless they are proven unreachable and documented here.
  • High advisories should have either a remediation PR or an explicit risk acceptance note before commercial deployment.

Verification After Remediation

After each dependency remediation batch:

pnpm install --frozen-lockfile
pnpm check:quality
pnpm audit:security
AUTH_TRUST_HOST=true PORT=3001 pnpm dev
SMOKE_BASE_URL=http://127.0.0.1:3001 pnpm smoke:routes

Record the remaining critical/high count in this file until the audit baseline reaches zero or only accepted exceptions remain.