ai-chatbot/docs/dependency-risk-register.md

4.7 KiB

yedir-ai Dependency Risk Register

Last local audit snapshot: 2026-05-27.

This register tracks dependency security debt that cannot safely be fixed as an incidental change. It exists so commercial delivery and open-source review do not rely on hidden tribal knowledge.

Audit Command

Use the official npm registry for audit checks:

pnpm audit:security
pnpm audit:security:json
pnpm --silent audit:security:json > audit-security.json

The explicit registry is intentional. Some mirrors do not implement the npm audit endpoint, which makes audit fail for infrastructure reasons rather than project reasons. Use pnpm --silent audit:security:json when another script needs machine-readable JSON without pnpm's script header.

GitHub Actions also runs .github/workflows/dependency-audit.yml on push, pull request, weekly schedule and manual dispatch. Keep that workflow independent from the fast quality gate so registry or network issues do not hide lint/typecheck feedback.

Current Snapshot

pnpm --silent audit:security:json currently reports:

  • Critical: 0 advisories.
  • High: 0 advisories.
  • Moderate: 44 advisories.
  • Low: 1 advisory.

The previous local baseline was Critical: 2 / High: 31. The remediation batches upgraded direct dependencies, patched transitive packages via pnpm.overrides, and removed the vulnerable xlsx parser dependency.

Remaining Moderate / Low Buckets

The current non-blocking advisories are still tracked because they may matter for specific feature surfaces:

  • dompurify: moderate XSS / sanitization bypass advisories from transitive rich-rendering dependencies. Treat any user-authored HTML rendering path as sensitive and prefer explicit server-side sanitization plus output escaping.
  • mermaid: moderate XSS / CSS injection / DoS advisories from diagram rendering dependencies. Avoid enabling untrusted Mermaid diagram rendering without sandboxing and version review.
  • postcss, esbuild, brace-expansion, yaml: moderate parser/dev-tooling advisories. These are primarily build-time or tooling-chain risks; keep production build and dependency audit workflows active.
  • markdown-it, mdast-util-to-hast, prismjs: moderate Markdown/syntax-rendering advisories. Treat user-provided Markdown as untrusted and keep renderer usage behind existing sanitization boundaries.
  • uuid, ws: moderate runtime/transitive advisories. Prefer patched transitive versions when upstream packages allow it; do not introduce new direct dependency pins that downgrade these packages.
  • ai: low filetype whitelist bypass advisory currently appears in audit output even though the direct dependency is on a patched line. Keep pnpm audit:security as the blocking high/critical gate and revisit if severity changes.

These buckets do not currently block release because the enforced gate is high/critical zero. They should be revisited during dependency maintenance, public Markdown/diagram feature changes, or before changing the project to a fully public repository.

Priority Remediation Buckets

  • xlsx: remediated by replacing spreadsheet import parsing with the existing exceljs dependency and dropping legacy .xls upload support from affected import paths.
  • next: remediated by resolving Next.js to 16.2.6; keep route smoke tests in the verification path.
  • fast-xml-parser: remediated through a transitive override resolving to 5.8.0.
  • protobufjs: remediated through a transitive override resolving to 7.5.6.
  • drizzle-orm: remediated by upgrading to 0.45.2; keep migration and route checks in future data-access changes.
  • @vercel/blob / undici: remediated through a transitive override resolving undici to a patched 6.x line.
  • ultracite transitive dev tooling chain: remediated through targeted transitive overrides for Vite/Rollup/Picomatch/tRPC/Lodash.

Release Policy

  • Keep pnpm audit:security in the independent Dependency Audit workflow and as a pre-release review command rather than embedding it in pnpm check:quality; the registry-backed audit endpoint can fail for network or mirror reasons.
  • New direct dependencies should be checked with pnpm audit:security before merging.
  • Critical advisories in runtime dependencies should block production release unless they are proven unreachable and documented here.
  • High advisories should have either a remediation PR or an explicit risk acceptance note before commercial deployment.

Verification After Remediation

After each dependency remediation batch:

pnpm install --frozen-lockfile
pnpm check:quality
pnpm audit:security
AUTH_TRUST_HOST=true PORT=3001 pnpm dev
SMOKE_BASE_URL=http://127.0.0.1:3001 pnpm smoke:routes

Record the remaining critical/high count in this file until the audit baseline reaches zero or only accepted exceptions remain.